PURCELLVILLE, Va. September 18, 2018 - On Tuesday, September 25, 2018, the Town of Purcellville will be changing out the carbon at the Main Street Village Filter Building, located at 220 McDaniel Drive. This work is a part of the annual filter maintenance, and will occur from 8 AM to mid-afternoon. A large vacuum truck will be at the site and will produce noise during the work; a hose will cross the roadway from hydrant to the filter building.